Problems / Solutions:

A cement facility needed an updated CEM system, but did not have a useable facility close to the stack to house the equipment. CEMSI designed and configured the CEM system around their compliant requirements and designed and built a custom shelter to house their gas conditioning and analytical equipment. Calibration gases were stored in a separate room for safety.

 

Summary:

The new CEM system based on the ABB ACF5000 was housed in a custom designed and built shelter to match their compliance, safety and site requirements.