Incineration & Waste, Hazardous Waste Incinerators

Problems / Solutions:

Two Hazardous Waste Incinerators required emissions monitoring of various combustion mixes. CEMSI designed and built a turn-key project including two multi-component, hot/wet CEM systems for the measurement of HCl, SO2, CO, THC, O2 and H2O, controlled environment shelters and support equipment. Follow-on contracts included the supply of a continuous mercury monitoring system, project management, engineering, installation, commissioning, development of a QA/QC Plan Manual, and third-party certification testing.

 

Summary:

The designed system allowed the end customer meet their compliance requirements and the support provided continued high operational performance.